
Add to Cart
Raw material | Aluminum Foil |
Color | Customized |
MOQ | 10000PCS |
Printing | Customer's Request |
Material | Food Grade |
Colors | Cutomized |
Size | 37*24*30mm |
OEM&ODM | Accept |
Sample | Availabe |
Grade | Food |
1.Delivery time: if the cargo do not arrive on time, compensation will be made accordingly. (Force majeure is excluded) 2. More than 8 year export experience.3.We have experience engineers in this field.
4. OEM service is capable.
5. Offer experienced suggestion to solve all problems for all customers
6. Products are exported to more than 60 countries and regions in the world,such as the United States, Canada, Japan, South Korea, India, Australia, Europe, the Middle East.
Prepare the capsules and materials: Prepare the coffee capsules and the packaging materials needed, such as the capsule body and sealing film, in advance.
Filling coffee: The capsules are filled with coffee that has been roasted and ground. This is usually done by a specialized filling machine, ensuring that each capsule is filled with the right amount of coffee and is well sealed.
Seal the capsule: The capsule filled with coffee is placed on another device, which automatically applies the seal film to the capsule, ensuring that the coffee inside the capsule is not affected by the outside world.
Check quality: Perform a quality check on the packaged coffee capsules to ensure that each capsule is up to standard and that there are no problems or damage.
Packaging: Place the packaged coffee capsules in the appropriate box or bag for storage and transportation. These packages usually add brand labels, production dates, expiration dates and other information.
Cleaning and maintenance of equipment: After completing the packaging work, it is necessary to clean and maintain the equipment used to ensure the normal operation and production quality of the equipment.
Q1: What is IML?
IML refers to an automatic robotic hand attaching a printed label to a jig by vacuum, entering the mold cavity and releasing the vacuum while electrostatically charging the label. After the mold is closed, the injection mold is filled, and the resin is melted into the mold at high temperature and high pressure The backside of the label is hot-melt adhesive resin, so that the label and container are integrated.
Q2: What system certification does your company have?
We have ISO9001, ISO14001, BRC Class A, GPM workshop, SEDEX, QS certification.
Q3: What is the development leading time of a new product? What is the mass production leading time?
5 days for the new product's drawing structure design, 4 days for prototype sample, 30 days for trial mold, 60-75 days for industrial mold, 10 days for label plate tooling, 10 days for the label sampling. The delivery time of mass goods in-mold labeling is 15 days, and the mass production leading time is generally 15-20 days.
Q4: What is the minimum order quantity? Can I place an order if I do not reach the MOQ?
Generally, the minimum square number of the label is 1500 square meters. If the MOQ is not reached, the labeling MOQ fee 200USD and the injection machine set up cost will be paid by clients.
Q5: Is your mold designed and made by yourself?
We have our own mold design, mold making workshop, and a 3 coordinate tester to check the precision of the mold.